HOW WE WORK

From Requirement to Handover

Every project starts with understanding what the system needs to do. From there, the engineering, panel execution, integration and testing are developed around the agreed project scope.

Start With Your Requirement
BEFORE EXECUTION

What Helps Us Start Faster?

You do not need every document below to start, but the more project information available, the faster the technical scope can be understood.

Send What You Have

Useful Information

  • P&ID
  • Single-line diagram
  • Electrical drawings
  • Panel schedule
  • Equipment or motor list
  • I/O list
  • Functional description
  • Existing control drawings
  • Site or installation requirements
EXECUTION SEQUENCE

From Application Understanding to Verification Before Handover

The technical scope moves through four clear stages, with the detail of each stage shaped by the actual project requirement.

01

Understand the Requirement

Start with the application, operating objective, available drawings and system interfaces.

Before drawings or components are finalized, we review the application, operating requirement and available project information to understand what the control system needs to achieve.

We May Review

  • Process or application description
  • Available drawings
  • P&ID
  • Equipment and motor information
  • I/O requirements
  • Operating sequence
  • Required system interfaces

The objective comes before the configuration.

02

Engineer for Execution

Turn the requirement into drawings, layouts, control logic and a practical implementation scope.

Once the operating requirement is clear, the control approach can be developed around the electrical loads, logic, interfaces and information needed by the system.

Engineering Can Include

  • Control philosophy
  • Electrical schematics
  • Panel layout
  • I/O architecture
  • PLC / HMI requirements
  • Motor-control approach
  • Industrial communications
  • Equipment interfaces

Engineering connects the operating requirement to something that can actually be built.

03

Integrate the System

Connect the panel, control platform, communications and field interfaces around the project architecture.

Testing checks whether the implemented control solution behaves according to the agreed requirement. Where the project includes multiple systems, this stage can also include verifying the required interfaces between them.

Depending on Scope

  • Electrical checks
  • Functional checks
  • Control-sequence testing
  • PLC / HMI interaction
  • Drive and field-device interfaces
  • System integration checks

A completed panel is not the same as a verified control system.

Integrate the System
04

Verify Before Handover

Check the implemented control scope before the system moves into operation.

Depending on the agreed project scope, ES Automation can support on-site integration, commissioning and technical handover as the control solution moves into operation.

The Scope Can Include

  • On-site commissioning support
  • Functional verification
  • Interface checks
  • Troubleshooting during commissioning
  • Technical documentation
  • Handover support
FROM SCOPE TO HANDOVER

Start With the Requirement.
Build From There.

Share the application, drawing or available specification and begin the technical discussion with our team.

Start the technical conversation

Send Us the Requirement.
We’ll Take It From There.

Share the panel specification, drawing or automation requirement and start the technical conversation.

Request a Quote